Wszystkie A B C D E F G H I J K L M N O P Q R S T U V W X Y Z #
Liczba wyników: 5
  • Office building — Commercial building used primarily for office work, with WC and kitchenette drainage.
  • Oil spillage drainage — Emergency response to oil spills entering drainage, with interceptor checks and EA notification.
  • Open joint (drain) — Drain joint with a gap between adjoining pipes, allowing root ingress and water loss.
  • Open-cut excavation — Traditional drain repair by digging a trench down to and along the pipe.
  • Out-of-hours drainage — Drainage response outside normal business hours, including evenings and weekends.