-
Office building
— Commercial building used primarily for office work, with WC and kitchenette drainage.
-
Oil spillage drainage
— Emergency response to oil spills entering drainage, with interceptor checks and EA notification.
-
Open joint (drain)
— Drain joint with a gap between adjoining pipes, allowing root ingress and water loss.
-
Open-cut excavation
— Traditional drain repair by digging a trench down to and along the pipe.
-
Out-of-hours drainage
— Drainage response outside normal business hours, including evenings and weekends.